Puhao

Introduction

 

Born 10,1973

Highest degree: Dr

Title: professor, Graduate Faculty

Department: Tunnel engineering

E-mail: csusch@163.com

 

Education experience

1997.09- 2000.06 Studied in Changsha railway institute in railway bridge and tunnel engineering for Master Degree;

2001.09-2007.06 Studied in Central South University in tunnel engineering for Dr. Degree;

2014.01 2015.01 visiting scholar of Australia's Monash university

 

Academic part-time

Deputy director of  the tunnel construction management and youth work committee China civil engineering society

National natural science foundation of China and Beijing, Zhejiang, and other provincial natural science foundation of peer review experts

 Reviewing authority experts of "Automation in Construction", "Tunneling and Underground Space Technology ", "journal of civil engineering", "journal of geotechnical engineering", "journal of Tongji university", "journal of tianjin university," journal of Harbin institute of Technology, "journal of Southwest Jiaotong university," journal of Central South University"


Courses
_________________________________________________________________________________________

Teaching courses

Undergraduate students: tunnel engineering, underground railway

Master students: tunnel mechanics

Research

Durability of tunnel and underground structure

Tunnel structure dynamics

The construction of tunnel and underground engineering technology under the complicated condition

Tunnel aerodynamics


Research
_________________________________________________________________________________________

cteristics and structure of railway tunnel structure design research of overloaded railway and tunnel structure, lateral, 2013-2015 (subtopic)

[19] Liuyang river tunnel construction under complicated geological conditions of major technology and risk management research, lateral, 2009-2010 (subtopic)

[20] Shallow buried large span complicated conditions of underwater tunnel construction major technology, horizontal, 2010-2012 (subtopic)

Research Project

Published more than 100 papers, of which the SCI, EI, included more than 60, published 2monographs units, 2 teaching materials, authorized more than 10 national invention patents, software copyright 6 items,

 

 

2, monograph,

SHI Chenghua , PENG limin, ;LEI Ming-feng. Shallow buried tunnel construction space-time unified stratum deformation prediction theory and application. Science published, 2010.11

PENG limin, AN Yonglin, SHI Chenghua . Near meet buildings under the condition of the tunnel construction safety and risk management theory and practice. Science published, 2010.6

 

3, patent

[1] SHI Chenghua , PENG limin, ;LEI Mingfeng, a artesian well or  group of nonholonomic dynamic displacement and drainage time calculation method in the process of rainfall, national invention patents: ZL 201210154886.6

[2] SHI Chenghua , PENG limin, ;LEI Mingfeng. , a diving well or group of nonholonomic dynamic precipitation  displacement and drainage time calculation method,  national invention patents: ZL 201210154576.4

[3] SHI Chenghua , PENG limin, ;LEI Mingfeng , a  complete diving well or group of dynamic displacement and drainage time calculation method in the process of rainfall, national invention patents: ZL 201210154866.9

[4] SHI Chenghua , PENG limin, ;LEI Mingfeng , an underwater tunnel underground construction design method of grouting reinforcement ring thickness, national invention patents: ZL 201210176528.5

[5] SHI Chenghua , PENG limin, ;LEI Mingfeng , a quantitative design method of bias tunnel primary support parameters, national invention patents: ZL 201110286713.5

[6] SHI Chenghua , PENG limin, SONGyi, , a engineering control measures based on the underwater tunnel, and a method for determining minimum depth national invention patents: ZL 201210110410.2

[7] SHI Chenghua , PENG limin, ;tunnel overbreak control laser lofting device, national invention patents: ZL 201110249545.2

[8] SHI Chenghua , PENG limin, ;LEI Mingfeng , a confined complete well or group of dynamic displacement and drainage time calculation method in the process of rainfall, national invention patents: ZL 201210154316.7

[9] Qiu Yejian, SHI Chenghua , PENG limin, a deformation displacement measurement method based on laser, national invention patents: ZL 201110347133.2

[10] SHI Chenghua , PENG  limin, rich water rockmass seepage coupled static and dynamic load - test device, the utility model patents: ZL201120323125. X

[11] Qiu Yejian, SHI Chenghua , PENG limin, LEI Mingfeng, a data acquisition device based on vehicle platform, the patent for utility model: ZL 201420342496.6

[12] Qiu Yejian, SHI Chenghua , PENG limin, LEI Mingfeng, based on the Angle measurement of track settlement measurement device, the patent for utility model: ZL 201420292355.8

 

4, software,

[1] SHI Chenghua , PENG limin, LEI Mingfeng . Shallow buried tunnel construction surrounding strata deformation calculation software, the software copyright

[2] SHI Chenghua , PENG limin, LEI Mingfeng . Shallow bias tunnel surrounding rock stress and construction parameter calculation software, the software copyright

[3] SHI Chenghua , PENG limin etc. high speed railway tunnel structure dynamic calculation software, the software copyright

[4] SHI Chenghua , PENG limin , etc. The underwater tunnel construction dynamic risk management system software, the software copyright

[5] SHI Chenghua , PENG limin , etc. The tunnel construction and operation period of lower structural deformation monitoring information management and prediction system

[6] SHI Chenghua , PENG limin , LIU Xiaobing , tunnel lining structure straight stiffness method calculation software, the software copyright


Publications
_________________________________________________________________________________________

Academic award

 [1] underwater ultra shallow buried large section interchange tunnel construction technology, won the 2nd prize of progress in scientific and technological of Hunan province, 2014.8, (2)

[2] Southwest Zhanzhong red layer weak rock tunnel deformation control technology research , won the 3rd prize of progress in scientific and technological of Yunnan province Chinese railway society, 2014.4, (3)

[3] rich water sand subway station integrated construction technology, won the 3rd prize of progress in scientific and technological of Anhui province , 2014.1, (5)

[4] sea-crossing roas tunnel shallow buried underground and risk control technology and method of design ,won the 1st prize of progress in scientific and technological of Henan province , 2013.1, (11)

[5] Liuyang river tunnel construction under the complicated condition major technology and risk management, won the 1st prize of progress in science and technology China railway engineering corporation, 2011.1, (9)

[6] Won the 2015 annual award for the best master thesis guidance teachers of Hunan province, Hunan province education department