Fangligang
Introduction

 

Date of Birth: November,1968

Highest degree: PhD

Title: Professor, certified faculty member of graduate School

Department:  Railway engineering

E-mail: pinglou@csu.edu.cn OR pingloucsu@126.com

Senior Research Assistant (Nov 2010 to Dec 2010) in The University of Hong Kong

Post - doctoral Fellow (Apr 2008 to Apr 2008) in The University of Hong Kong

Education

1992.06 Studied in Xiangtan mining institute in mining engineering for Bachelor's Degree;

1997.06 Studied in Changsha railway institute in railway engineering for Master's Degree;

2007.10 Studied in Central South University degree in bridge and tunnel engineering for PhD Degree ;

  Academic Affiliations

Member, the Editorial Board of the Coupled Systems, Mechanics, An International Journal (2015 -)

Deputy Secretary of Chinese Railway engineering professional committee in lines

Member of professional committee of experts on the design foundation  of Chinese construction standardization association structure


Courses
_________________________________________________________________________________________

courses

Railway track

Railway engineering

High-speed and heavy-haul railway

Structure reliability engineering

Structural reliability theory

Structure dynamic reliability theory~


Research
_________________________________________________________________________________________

 

Research

 High-speed and heavy-haul railway track engineering theory and application

Train/track (bridge) coupling dynamics  

Design theory of railway track reliability  

 Research Projects

The management or the main part of the research projects

1. Preside the national natural science fund committee - the ministry of railways high-speed rail joint fund key basic research projects: high speed railway seamless line state evolution mechanism and regularity of research (U1334203), 201401-201712;

2. The national natural science fund project: on the surface of high speed railway bridge type II on the track plate seam mortar layer alienation mechanism and impact study (51578552), 201601-201912, presided ;

3. The national natural science fund project: on the surface of frantic jumble orbital high-speed train running safety and comfort of the dynamic reliability research (51078360), 201101-201312, presided ;

4. The key project of  Chinese national natural science foundation : the high-speed passenger railway station bridge and building hybrid structural system research (50938008), 201001-201312, presided  by component 2 "Under the action of high-speed train room bridge and dynamics research of hybrid structure system";

5. Natural science foundation project of Hunan province : slab track of high-speed train running safety and comfortable of dynamic reliability theory research (10 jj3059), 201001-201212;

6. The nine Chinese railway  innings Group 6 engineering co project: Hangzhou long railway passenger dedicated line bid CRTS plate without a frantic jumble rail base plate thickness inspection research, 201406-201412;

7. Shanxi Luan group of Sima coal co., LTD. project: under the 7806 face of the WuYang Coal mine Zhuozhanghe highway arch bridge project demonstration research, 201007-201112;

8. Shanxi Luan group of Syma coal co., LTD: Sima coal mine deep high stress of surface subsidence rule of the caving mining with pillar optimization research, 201407-201712;

9. Shanxi Luan group of Syma coal group co., LTD project: 1112 face extremely thin bedrock movement of overburden rock damage rule and water prevention and control technology research, 201407-201606;

10. University-industry cooperation innovation engineering construction projects in Hunan province, Changsha Xiangjiang river big shield tunnel construction key technology research, 201101-201306, hosted six project "tunnel excavation face stability reliability analysis";

11. The ministry of science and technology research and development plan key projects: large district "room bridge and structural dynamics experimental study (2009 g007 - A), 201001-201112, presided over project 2;

12. The national natural science fund projects: continuous welding long rail track stability reliability analysis (59578029), 199601-199812, mainly research;

13. The national natural science fund projects: straight line freight train derailment analysis theory research (50078006), 200101-200312, mainly research;

14. The ministry of education doctoral train derailment funded project: energy random analysis theory and protection technology research (20010533004), 200101-200312,  mainly  research;

15. The ministry of science and technology research and development program major project: high speed railway civil engineering technology system integration research (2008G031-1), mainly research;

16. The ministry of science and technology research and development key projects: straight line freight train derailment process calculation and protection derailment parameter research (2001G029), 200201-200412, mainly research;

17. The ministry of science and technology research and development pl key projects: the bridge dynamic index analysis and train travel safety   (2003G043), 200307-200512,  mainly research;

18. Hunan province science and technology plan projects: mechanical mechanism of train derailment on the bridge research (04 fj4022), 200401-200412,  mainly research;

19. Hunan province science and technology plan projects: no ballastless track of passenger dedicated line kinetic parameters research (2007FJ4110), 200701-200712,  mainly research;

20.Hong Kong highways department project: the Establishment of Bridge Rating System for Ting Kau Bridge (STR - CON / 300/121 / OJ (A)), 200701-200912, mainly research;

21. Hunan province science and technology  projects: horizontal wind vibration of high-speed train - no ballastless track system space impact analysis  (2008 FJ4023), 200801-200812,  mainly research;

22. The ministry of science and technology research and development plan key projects: high altitude railway maintenance technology research (Z2013 - G006), 201301-201412,  mainly research;


Publications
_________________________________________________________________________________________

Awards

2005-2007, 2009-2011, 2011-2015 won the title of excellent communist party member in Central South University;

2011-2013 won the title of excellent branch of civil engineering institute .

Academic awards

Cultivation of Youth backbone teachers of Hunan province ordinary university in 2006;

Won the 1st prize of progress in science and technology  of hunan province, the fourth;

Won the 2004, 2010 MAO Yisheng railway special education scientific research award.